top of page
FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
Nov 18, 20221 min read
79 views


Feed Hopper & Conveyor
Our client requested to feed an existing conveyor system with a standby hopper in the case of maintenance on the current stockpile. Not...
Nov 30, 20211 min read
87 views


40-ton Apron Feeder Chute Project
We're currently busy with the detailing and manufacturing drawings of this 40-ton apron feeder chute. We can't wait to share the full...
Oct 25, 20211 min read
63 views


A Maintenance Frame For Sishen Iron Ore
Our client was doing maintenance on their DMS crusher shafts. Because no work under a suspended load is allowed, we had to develop a...
Nov 21, 20201 min read
84 views
bottom of page