top of page
FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


TMM Inspection Facility for Anglo-American Kumba Iron Ore
Anglo-American Kumba Iron Ore employed JAD to assist with the design, draughting, procurement, and manufacturing of a vehicle inspection...
Apr 20, 20231 min read
Â


Access Platform and Stairs on Primary Crusher Control Room Roof
Large objects sometimes get wedged inside the primary crusher; the need arose to scan the loads dumped into the crusher. Our team created...
Nov 18, 20221 min read
Â


Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
Nov 18, 20221 min read
Â


Feed Hopper & Conveyor
Our client requested to feed an existing conveyor system with a standby hopper in the case of maintenance on the current stockpile. Not...
Nov 30, 20211 min read
Â


Dump Truck Bumper Solution
To prevent LDV's from being trapped underneath a haul truck, we designed bumpers for 13 different trucks at two separate mining operations.
Oct 25, 20211 min read
Â


A Maintenance Frame For Sishen Iron Ore
Our client was doing maintenance on their DMS crusher shafts. Because no work under a suspended load is allowed, we had to develop a...
Nov 21, 20201 min read
Â
bottom of page