top of page
FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


TMM Inspection Facility for Anglo-American Kumba Iron Ore
Anglo-American Kumba Iron Ore employed JAD to assist with the design, draughting, procurement, and manufacturing of a vehicle inspection...
Apr 20, 20231 min read
67 views


Access Platform and Stairs on Primary Crusher Control Room Roof
Large objects sometimes get wedged inside the primary crusher; the need arose to scan the loads dumped into the crusher. Our team created...
Nov 18, 20221 min read
119 views


Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
Nov 18, 20221 min read
79 views


Feed Hopper & Conveyor
Our client requested to feed an existing conveyor system with a standby hopper in the case of maintenance on the current stockpile. Not...
Nov 30, 20211 min read
87 views


Dump Truck Bumper Solution
To prevent LDV's from being trapped underneath a haul truck, we designed bumpers for 13 different trucks at two separate mining operations.
Oct 25, 20211 min read
50 views


A Maintenance Frame For Sishen Iron Ore
Our client was doing maintenance on their DMS crusher shafts. Because no work under a suspended load is allowed, we had to develop a...
Nov 21, 20201 min read
84 views
bottom of page