FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


DMS Primary Crusher (Sishen Iron Ore)
JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
Mar 2, 20231 min read
Â


El Soldado Mine Bulk Measuring Project
The task was to design a new portal structure for the Particle Size Analysing (PSA) system at Anglo-American El Soldado Mine. 3D Scanning...
Nov 19, 20221 min read
Â


Access Platform and Stairs on Primary Crusher Control Room Roof
Large objects sometimes get wedged inside the primary crusher; the need arose to scan the loads dumped into the crusher. Our team created...
Nov 18, 20221 min read
Â


UHDMS Plant Particle Analysers (Geo Scan)
JAD was brought the challenge of assisting our client, Anglo-American Kumba Iron Ore Sishen Mine, with designing a support frame (with...
Nov 18, 20221 min read
Â


Office Revamp Anglo Sishen
After already working on office revamps, Anglo-American approached us to revamp their engineering, geology, and surveying offices at...
Nov 18, 20221 min read
Â


Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
Nov 18, 20221 min read
Â


3D Scanning for South32
Our client, South 32, requested to verify a newly fabricated hood for their Arc Furnace. Due to the short shutdown time and enormous...
Oct 25, 20211 min read
Â