FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


JAD Water Treatment Plant
JAD, together with WEC Projects, was tasked with the design and draughting of a 15 000 000-litre/day water treatment plant. This included...
May 25, 20231 min read
Â


WEC Container Plants
JAD partnered with WEC Projects to complete four (4) wastewater treatment plants destined for Guinea. WEC Projects has vast experience in...
May 19, 20231 min read
Â


North Concentrator DAF Tank
JAD was tasked with designing a take-off tank at Anglo Platinum’s Mogalakwena Mine, particularly by the North Concentrator. The tailings...
May 10, 20231 min read
Â


Cell Froth Sensors (Quellaveco Peru)
Anglo American’s flagship mine, Peru Quellaveco Copper Mine, approached JAD Design & Draughting to assist with modelling a total of 76...
Apr 5, 20231 min read
Â


Access Platform and Stairs on Primary Crusher Control Room Roof
Large objects sometimes get wedged inside the primary crusher; the need arose to scan the loads dumped into the crusher. Our team created...
Nov 18, 20221 min read
Â


Jig Primary Crusher (Sishen Iron Ore)
Anglo American Kumba Iron Ore Sishen Mine, approached us to assist in installing a big rock detection system at their Jig Primary...
Nov 18, 20221 min read
Â


Peru: Air Curtain Project
The client, Anglo American Quellaveco Mine, approached us to design a PSA crusher air ducting system for a mine in South America. The...
Mar 11, 20221 min read
Â


Dump Truck Bumper Solution
To prevent LDV's from being trapped underneath a haul truck, we designed bumpers for 13 different trucks at two separate mining operations.
Oct 25, 20211 min read
Â


Hydraulic Cylinder Design
A diverter chute hydraulic cylinder was designed by one of our Senior Mechanical Draughtsmen, complete with detailed drawings for...
Oct 25, 20211 min read
Â


A Fully Mechanised Mobile Unit
The planned dewatering of a mining area with boreholes up to 400m deep is conducted manually by uncoiling and recoiling the electrical...
Oct 25, 20211 min read
Â


Stockpile feeding a conveyor using an Apron Feeder.
With no existing drawings and the feeder having a relatively custom design, we had the task of re-engineering the feeder with limited and...
Apr 8, 20211 min read
Â


CAT 785 Tow Hook Design
This tow hook was designed to connect the recovery vehicle and a CAT 785 haul truck. With a 17.8-ton capacity, this hook is durable...
Feb 25, 20211 min read
Â