FEATURED PROJECT


PIVOTING JIB BOOM
CLIENT: Anglo American SCALE: n/a PROJECT DURATION: 2 months SCOPE OF WORK: Safe Access SECTOR: Mining...
Oct 30, 20231 min read
Search


DMS Primary Crusher (Sishen Iron Ore)
JAD461 – Sishen DMS – Big Rock Detection System Anglo-American Kumba Iron Ore Sishen Mine approached us to assist in installing a big...
Mar 2, 20231 min read
Â


Dump Truck Bumper Solution
To prevent LDV's from being trapped underneath a haul truck, we designed bumpers for 13 different trucks at two separate mining operations.
Oct 25, 20211 min read
Â


A Fully Mechanised Mobile Unit
The planned dewatering of a mining area with boreholes up to 400m deep is conducted manually by uncoiling and recoiling the electrical...
Oct 25, 20211 min read
Â


Maintenance on stockpiles
South 32 Metalloys Meyerton experienced difficulties during the maintenance of their stockpiles. Continuous production is one of the...
Oct 25, 20211 min read
Â


Safe access into a jig primary crusher apron feeder
We were appointed to design a solution for safe access to the feeder. Our team’s solution was for a retractable walkway that slides...
Oct 25, 20211 min read
Â


Stockpile feeding a conveyor using an Apron Feeder.
With no existing drawings and the feeder having a relatively custom design, we had the task of re-engineering the feeder with limited and...
Apr 8, 20211 min read